Healthcare

Amersham Health Centre

This project involved the replacement of existing roof structure and coverings to the area above the patient waiting room, main reception and adjacent corridors and offices within the Health Centre.

 

The area is the ‘inner roof’ area, which is bounded on all sides by a higher roof.

This project was carried out entirely through out the first COVID-19 lockdown.

More Projects